Hi all,
I just noticed this behavior today: I have a scheduled job than downloads 5 files. Last night, when the scheduled job ran, it d/l the first 3, but the 4th was not available. That's OK, but what I noticed is Voyager quit the job without checking if the 5th file was available (it was). I am consistently able to reproduce this behavior, so it's not a "bug." Just for kicks, I went back over the logs for the last year, and this has been happening the entire time. I can't seem to find any setting that would alter this behavior, does anyone know what, if anything, can be done?
Al